Shytell Technology Services · Select your equipment brand to continue

Hidros Hydros Hydraulic Systems
Emicon Emicon Dehumidification
Enex Enex Climate Control and Energy
Ethratech Ethratech Telecom and Industry
FM Technological Group General technical service

Applicant details

Equipment details

Installation details

There is secure access to the equipment

General technical data

There is a demand for thermal load to carry out PEM equipment/s
Emission system fully operational (air conditioners, fan coils, diffusers...)
Thermostats and temperature/humidity probes connected

Electrical data

Final supply voltageThe equipment is exempt from warranty if the PEM is not carried out with final voltage
Line protection installed
Differential protection installed
Electrical supply connected to equipment/s
Phase sequence checked (outdoor/indoor unit, refrigerant probes)
There is a start/stop control
Start/stop control connected
There is an external cold/heat control
There is a flow switch and interlock between the control circuit and the pumpOnly for installations with a hydraulic circuit

Hydraulic circuit

Checked nominal water flow to equipment
Frost protection installed
Water inlet filter to equipment installedFilter with mesh >1mm. Without it, the equipment is exempt from warranty
There is an inertia tank
There is an expansion vessel
There is a safety valve

Refrigeration circuit

Only split units
Refrigeration pipe installation completed
Leak tests completed
Vacuum tests completed
Gas charge completed

Ventilation circuit

Air-to-air and water-to-air units
Clean filters

Covered pools

Only pool climate control
Water treatment carried out in dischargeWater treatment should never be carried out in return

Centralised management

Connection between equipment completed according to technical documentation
Equipment with assigned address

Access

The units are safely accessible

Budget

Fill in this section if the commissioningis not included in the sale.
I request a prior budget
I authorise commissioning waiving the budgetThe waiver is made knowing the right to request a prior budget and its possible legal consequences

Coordination of business activities

WITH Coordination:No less than 10 days after the date of this request
WITHOUT Coordination:No less than 5 days after the date of this request
Always check the identity of our employees by requesting a company ID and D.N.I.
Requests that are not properly completed will not be attended to.